Moving HVAC Units onto Plinths

Project Overview

When we received the call from a client looking for help with moving these 1.5 tonne HVAC units onto concrete plinths, we knew this was a challenge we could resolve.

While others had tried to find away to move the units into place, no-one had yet come up with a solution which is when we got called.

This is another example of "outside the box" thinking by our team, cleverly rolling the units into place along the custom designed and built tracks which were then able to be removed once the units were installed.

CONTACT US HERE

Visit/Post: 77A Paraone Koikoi Drive, Tauriko, 3110

Phone: 07 220 9891

Email: admin(at)fabworx.co.nz

 

REVIEW US FOLLOW US
white google icon.png white fb icon.png

 